ISO 9001:2015 Certified Manufacturer
Precision mold components

Home  /  Services  /  Components

SERVICE 04

Components

Cores, inserts, ejector pins, slides and wear parts in hardened tool steels — ground and EDM-finished to ±0.002 mm.

OVERVIEW

Precision parts that keep the tool running.

Replacement and custom mold components, made to print and measured.

±0.002 mm

Grinding tolerance

Ra 0.2

Surface finish

1–3 wk

Typical lead time

48–62 HRC

Hardened steels

When a mold goes down, every hour counts. We manufacture replacement cores, inserts, pins, sleeves and slides to the original drawing — or reverse-engineer them from a sample.

Our component cell combines CNC milling, surface and profile grinding, EDM, wire EDM and heat treatment. Hardened steels such as SKD11, SKD61, S136 and DC53 are machined, hardened and finished with the hardness and surface finish recorded.

We support single-piece replacements, spare-part kits and production quantities. Typical parts include core and cavity inserts, ejector pins and sleeves, slide shoes, wear plates, sprue bushings, hot-runner tips and custom fixtures.

✓ Made to drawing or reverse-engineered

✓ Hardness and material certificates

✓ Wire EDM and profile grinding

✓ Single parts or spare-part kits

CAPABILITIES

What we deliver

Practical capabilities, matched to the tooling and the production volume — not a generic menu.

01

Core & cavity inserts

Replaceable inserts machined, hardened and finished to the original cavity geometry.

02

Ejector pins & sleeves

Standard and custom ejector elements with matched lengths and fits.

03

Slides, lifters & shoes

Wear-resistant slide components, guides and replaceable wear plates.

04

EDM & wire EDM

Fine-detail cavities, sharp corners and hardened-steel profiles to ±0.003 mm.

05

Surface & profile grinding

Flat, parallel and profile ground to ±0.002 mm with Ra 0.2 µm finishes.

06

Hot-runner & gate parts

Tips, nozzles, bushings and gate inserts matched to the hot-runner system.

SPECIFICATIONS

Typical range and tolerances.

Every project is quoted against the part, material and inspection requirement. Values below are typical starting points — we confirm the exact capability for your drawing.

Grinding tolerance

±0.002 mm

Wire EDM tolerance

±0.003 mm

Surface finish

Ra 0.2 µm (ground)

Hardness

48–62 HRC (material-dependent)

Max length

800 mm

Coatings

TiN, TiAlN, DLC on request

MATERIALS & TOOLING

Materials we work with

SKD11 · SKD61 · S136 · DC53 · H13 · Tungsten carbide · ASP-23

Documentation

✓ Material certificates on request

✓ Dimensional report with critical dimensions

✓ Trial report and process parameters

✓ 2D drawings and spare-part list

PROCESS

How the project runs

A named project manager, weekly reporting and documented sign-off at each stage.

01

Drawing / sample

Review the drawing or reverse-engineer the worn part.

02

Machining

CNC, grinding, EDM and wire EDM to the required tolerance.

03

Heat treatment

Hardening, tempering and stress relief with recorded hardness.

04

Final inspection

Dimensional check, surface finish and fit verification.

GALLERY

From the floor

Representative tooling, machining and inspection work from our Kunshan facility.

Precision mold components Finished mold tool Trimmed metal part

FAQ

Questions, answered.

Can you make a replacement from a broken part?

Yes. We can measure the sample, reconstruct the geometry and manufacture a replacement, including hardened and coated versions.

What is the minimum order quantity?

One piece. We support emergency replacements as well as scheduled spare-part kits.

Do you provide material and hardness certificates?

Yes, on request. We record steel grade, heat-treatment batch and measured hardness.

How fast can you turn around an emergency part?

Simple ground parts can be shipped within days; EDM or hardened parts typically take 1–3 weeks. Share the drawing and we will confirm.

START A PROJECT

Have a mould project in mind?

Send us your part data and requirements. We will reply with a DFM review and a clear quotation within 24 hours.